Installation took 12 hours
The company plans to launch the enterprise in 2028
The tractor is equipped with a 542 hp engine
The first energy was planned to be received in April 2025
The tractor was created specifically for large agricultural holdings
Evolution can withstand temperatures below -50 °C and can reach speeds of up to 45 km/h
In a negative scenario, passenger traffic will decrease to 105-110 million people per year
Vladimir Putin and Viktor Orban invited to the ceremony of laying the first concrete of the station
It was planned to return at least 12 aircraft to the sky in 2024
There is a possibility of an X10 class flare
Investments in the project will amount to 2 billion rubles
The concern has begun preparing production sites
The MPSV06 project vessel had its external video surveillance system tested
A cloud of cold hydrogen covered a third of the solar disk
The X1.1 flare lasted 15 minutes in sunspot group 4298
The plasma cloud will reach Earth on December 9
Moving away from foreign components launched the serial production of Project 23550 ships
The new mechanism can withstand about 50,000 shots without visible wear
Another 40 "Moscow-2026" series cars will be put into operation by the end of the year
Flares M1.1 and M8.1 were recorded in area 4299