The countries also adopted a roadmap for cooperation in the field of satellite navigation
The "black" wing was installed on board No. 0013 for the first time
More deliveries of new aircraft are planned before the end of the year
Время приведения комплекса в рабочее состояние не превышает 15 минут
In total, more than 1.6 thousand cars have been evacuated in the capital since the beginning of the year
The M5.0 flare was the most powerful since September 28 of this year
The minimum price for Sollers ST9 is 3,349,000 rubles
The decision by the Samara region authorities will help the auto giant avoid unnecessary borrowing
Civilian version of the army vehicle is offered for 8 million 350 thousand rubles
Authorities plan to attract 28 billion rubles in investment
Deputy Zhuravlev stated that Russia's international obligations do not limit this
Budget investments will amount to 2.5 billion rubles
Car sales are planned to resume by the end of November
Engineers are assessing the possibility of building a twin-tube tunnel that will connect Chukotka with Alaska in eight years
The tank received additional anti-drone protection, which maintains the mobility of the turret and increases its survivability in battle
The development will reduce the time and cost of drone maintenance
Cars are assembled at the former Mercedes-Benz plant
Company revenue decreased by 11%
The complex has already proven itself in the fight against low-flying targets
The country will also strengthen its influence in South Asia
Caracas emphasizes the combat readiness of aviation and readiness to use modern weapons
Ammunition dives on the target from the stratosphere
Crews are modernizing equipment on the spot, strengthening defense against kamikaze drones
JL-XX trainer created based on Yak-130
The complex synchronizes reconnaissance with the combat module and simplifies the targeting process
Light airframe will save fuel and reduce ticket costs
"Russian Knights" showed their class by performing group and solo aerobatics
According to analysts, the Project 09851 submarine implemented technology to hide from the enemy's hydroacoustics
The company's long-term liabilities increased to 179.7 billion rubles
The aircraft is capable of transporting up to 46 tons of equipment and weapons
The development is an artillery module with a drum mechanism
The special design of the GTD-1250 makes the tank ideal for the Arctic
Deputy Prime Minister Savelyev called the MC-21 a serious competitor to Boeing and Airbus
The submarine of project 09851 was specially designed for the new underwater complex