Scientist Viktor Razbegin, the author of the project, said that the length of the tunnel through the Bering Strait, including exits, may vary from 98 to 112 kilometers.
The minimum width of the strait in this place is about 83 kilometers. But, firstly, it is necessary to count together with the exits. Secondly, the route does not go along the shortest distance, given the fact that in the middle of the strait there are two islands - Ratmanov Island and Krusenstern Island. There are only four and a half kilometers between them, and they are very convenient to use for construction.
Studies of tunnel options have been conducted since the 1990s. The most promising concept involves two transport tunnels and one service tunnel, connected by adits. The structure may consist of three sections, two of which will be comparable in length to the Channel Tunnel.
The head of the Russian Direct Investment Fund, Kirill Dmitriev, also announced the project, noting that with the use of Boring Company technologies, the tunnel could be built in less than eight years, and the costs could be about $8 billion.
Such a tunnel would be twice as long as the Channel Tunnel connecting France and Great Britain. Its length is about 51 kilometers.
Earlierwww1.ru reported thatelectric vehicles will no longer be allowed on the Crimean Bridge.
Read also:
Now on home
The platform allows you to send short videos to random people and watch other people's video messages
Likhachev spoke at the AtomSkills championship in Yekaterinburg
The General Designer of NPO Mashinostroyeniya was 74 years old
New friction stir welding technology creates strong bimetallic joints without delamination
Patented technology simplifies the production of lightweight and rigid thin-walled structures
The electromechanical device spins dozens of metal and fiberglass cables, creating a protective zone
New circuit opens the way for reliable electronics in extreme conditions
The Ministry of Health is preparing to launch a system that will store data on vaccinations, contraindications, and refusals
Joint venture established for exploration and processing of raw materials for high-tech industry
The restyled SUV received a turbo diesel, LED optics, and a new multimedia system
The device will allow conducting research at the nanometer level
The enterprise will be launched at the end of 2028, with a design capacity of 10.5 thousand extra-large tires per year