
Russian Aircraft Engines Find a Buyer Abroad
Cooperation between Russia and India includes not only the sale of units, but also their production

Cooperation between Russia and India includes not only the sale of units, but also their production

Fuel nozzle housings are now made in 24 days instead of six months

"UEC Engineering" Filed a Lawsuit Against PJSC "NPO "Iskra"

Russian specialists mastered the service of SSJ-100 systems

Experts are refining the engine for marine operation - corrosion, salt water, and frequent water landings require new solutions

The unit confirmed the performance characteristics in heavy rain conditions

The corporation strives for high localization and a full production cycle

The aircraft has already made its first flight from St. Petersburg to Kaliningrad

The court sided with UEC-Saturn in a dispute with Megastroyproekt over the supply of sensors

Major Fraud Uncovered at Branch of VSMPO-Avisma Plant

The entire power and load-bearing structure of the aircraft will have to be re-developed

SaM146 and CF-34 May Be Suitable, But the Probability of Their Installation on the Aircraft Is Minimal

The power plant for the SJ-100 has yet to prove itself in action

SLP520 Series Machine Improves Cutting Precision of Power Unit Parts

The use of lightweight parts will increase the life cycle of the power unit