The liner was in the air for about 40 minutes
The liner was in the air for about 40 minutes
Computer modeling was used to speed up the certification of power plants
A large number of brackets and mounts are located on the power unit
The system controls important parameters for efficient and economical operation of the power plant
The power unit was mounted on the prototype aircraft 95157
Flight tests will begin after the completion of ground tests
The dual-circuit turbofan engine was developed using advanced technologies
A specialization center for assembling doors and hatches for SJ-100 aircraft was previously created in Komsomolsk-on-Amur
The turbofan engine was developed using the latest domestic materials and advanced technologies
Aircraft manufacturers will receive only 128 power plants instead of the planned 192
Engines Showed Their Problems During Air Tests
Engine manufacturers will reduce full-scale tests of the PD-8, but this will not affect engine safety
Ministry of Industry and Trade: Engine building is a systemically important sector of the economy
Rostec will put into operation the latest Russian 3D printer
According to the president, "90 percent is already a fully localized product"