
UEC Plants Accelerated Aircraft Engine Production: Machine Downtime Fell by a Third
About 2,500 pieces of equipment connected to the online control system

About 2,500 pieces of equipment connected to the online control system

State Expert Review Board approves construction of a 10,000 m² facility at "Perm Motors"

Power units are exposed to crystalline ice

Khrabrovo Airport CEO: There is a Big Headache with Airplanes, but There is Positive Momentum

GIP-2200 press processes critically loaded elements of gas turbine units

The corporation called the 150-hour tests an important stage before mass production

UEC received certificates from Rosaviatsiya for control system units

Experimental aircraft No. 97023 climbed to an altitude of 11 km

"ODK-Saturn" May Become a Member of the Special Economic Zone in Rybinsk

The complex speeds up the production of gas turbine unit parts

Every accumulated hour confirms the engine's reliability, safety, and readiness for serial production

Development was accelerated through the use of PD-14 groundwork, digital modeling, and cooperation among UEC enterprises

UEC has developed a system to protect gas turbine engines from fuel supply disruptions with automatic mode correction

Analyst Marzhetsky proposed introducing palladium catalysts into the units