
New Engineers Being Trained for PD-35 and PD-14 Engines
Students from the "Wings of Rostec" track from Moscow and St. Petersburg completed internships at ODK-UMPO

Students from the "Wings of Rostec" track from Moscow and St. Petersburg completed internships at ODK-UMPO

The power unit's operating time has reached its overhaul life of 25,000 hours

New gearbox and accessory drive units created for the power plant

The melting point of alloys reaches 1400 °C

Oleg Panteleev: "More full-scale tests have been carried out for the PD-8 program than for the Russian-French engine"

Andrey Patrakov: the "hot" zone has the most risks

Each power unit has 18 such power elements

Five engineering solutions reduced the weight, drag, and maintenance cost of the power plant

Engineers implement isothermal forging, laser hardening, and electrochemical rotor processing

Heat-resistant alloys and 3D printing will reduce fuel consumption and increase aircraft engine life

The unit has been operating on associated gas since 2004

A neural network model analyzes images from an electron microscope and determines material characteristics

Three 16 MW units will be supplied for the compressor stations of the Yuzhno-Kirinskoye field