Thanks to the project of Russia's first high-speed railway line Moscow - St. Petersburg, Russian Railways (RZD) will be able to save 600 billion rubles on infrastructure investments. This was announced by the head of RZD, Oleg Belozerov.
When building the HSR, we free up our existing infrastructure, we can launch additional freight trains there. This is an additional 30 million tons and, in fact, it is a saving of at least 600 billion rubles of investment in additional infrastructure.
Such savings will avoid increasing the tariff burden in the amount in which it "should have been increased" if Russian Railways were building freight routes. The project will increase export cargo flow towards the seaports of the North-West from more than 30 regions of the country, including cargo-generating regions such as Samara, Belgorod, Sverdlovsk and Lipetsk.
The first branch of the high-speed railway will connect St. Petersburg and Moscow. It will be intended for passenger traffic and will pass through the territory of six Russian regions — Moscow, St. Petersburg, Leningrad, Novgorod, Tver and Moscow regions. Trains will run at 15-minute intervals. By 2030, passenger traffic between St. Petersburg and Moscow will be about 23 million people per year.
The design and construction of the HSR-1 Moscow-St. Petersburg line is scheduled for 2024-2028. Commissioning is scheduled for the second quarter of 2028.
Earlier www1.ru reported that the design of the Russian high-speed train is approaching.
Read materials on the topic:
Construction of HSR Launched in Russia: 14 Stations to Appear Between Moscow and St. Petersburg
Ministry of Transport is Working on the Construction of a New High-Speed Railway to New Regions
Putin Shown a Model of the Russian High-Speed Train: What is Known About the HSR Project
Now on home
The solution will speed up assembly and simplify the installation of onboard equipment
A data transmission scheme has been developed for the electric vehicle, separating technical and user traffic
Alexey Voevoda: the residual price of the aircraft is 300 thousand rubles
Rosstandart has introduced new formats of state license plates for personal mobility devices
Experts predicted the departure of imported brands from the market when the new rules for calculating payments come into force
The Federal Antimonopoly Service (FAS) has established that UEC-Saturn violates payment deadlines for small businesses
Dmitry Rogozin: Nuclear weapons are in very good condition and ready for use
The "Gonet" project is designed for a satellite system of up to 180 devices
Modifications of the units became a development of the basic versions of manual transmissions
Blue Sky Pro light lenses generate radiation that mimics the spectrum of the morning and evening sun