- Thematics
- Industry
The development performs dangerous operations without human involvement and accelerates well construction
The plant needs specialists in rotary friction welding
Work experience is mandatory
The "Green" model with 41 degrees of freedom and force-torque fingers will appear by autumn
The 790 km oil pipeline is in the final stage of construction
Two 882 kW engines accelerate the 32-meter aluminum-magnesium alloy hull
Reserve diesel generators put on standby
The second generation of the device was created taking into account the experience of operating the previous model
The first batch is 8 thousand units, final assembly will be done by the customer
The novelty withstands high temperatures and retains strength even after exposure to moisture
The development allows engineers to determine component requirements in advance and reduce the time for creating new vehicles