The new product is offered in three versions
The new product is offered in three versions
Extension terms not specified
Expected production volumes - 20 river-sea class vessels annually
Total investment in the project amounted to more than 250 million rubles
The launch complex will be prepared for launches by the end of winter 2026
The production operates on a full cycle - from "primary chemistry" to battery production
Engine thrust - 1.36 kgf
"Moskvich" M90 was named the flagship of the brand
UMG WL50 Equipped with Import-Substituted Axles with Increased Load Capacity
The system allows controlling UAVs without a remote control or other devices
Testing of the new locomotive will begin in 2026
Version 2.1 of KIROVETS-AGROPILOT adds extended ISOBUS support
The introduction of Russian equipment is expected in 2028-2029
The CNF22 project vessel is designed to serve Far Eastern routes
The program allows calculating the parameters of electrical networks and optimizing them
The state corporation plans to start making equipment for a new generation reactor
The system is designed to monitor the geophysical environment and "space weather"
The vessel of the TSK.395M project has a capacity of 1300 hp.
The new product will replace German counterparts in the Russian market
Model payload capacity - 130 tons