The plant is scheduled to launch in 2026
The plant is scheduled to launch in 2026
Made of domestic polymer composite materials
Only the operating organization of the Russian Federation can be responsible for the operation of the station
The vessel of project 03141 was launched on September 25
The reason for indexation may be inflation, an increase in VAT, and rising production costs
Among the spacecraft are Aist-2T No. 1 and No. 2
There is a need to increase air traffic within Russia and abroad
The first energy was planned to be produced in April 2025
The drones have been re-flashed and have shown reliability in testing
The train tests were successfully conducted in October
Boarding with biometrics will be available in the second half of 2026
New solutions include a balance suspension and inertia brakes
Rosatom and the Chinese company Dongfang will be engaged in the construction of the plant
The speed of the solar wind near the Earth is now reaching about 700 km/s
New module allows prescribing any conditions and parameters
The rotorcraft received new engines and onboard equipment
The capabilities of power grids and energy generation in Yakutia are planned to be developed
Relations between the two countries were called a factor of stability in the world
Putin called the direct line and sociological surveys the best tools for obtaining data
Unmanned platforms will make it possible to develop new ways of delivering goods