Russia's most powerful gas turbine in history, the GTE-300 with a capacity of 300 MW, has reached the conceptual design stage. This was announced by Alexey Podkolzin, head of "Silovye Mashiny" company.

Источник изображения: Reve Art
According to him, negotiations on demand for the unit have already begun with potential buyers.
In principle, the conceptual design of the GTE-300 is already underway. And I think we understand how to make such a machine.
Presumably, a prototype of the GTE-300 could be built within 7 years, and the horizon for the start of serial production is up to 9 years.
The GTE-300 is being developed to replace heavy gas turbine units with a capacity of 250 to 300+ MW, which were supplied to Russia by world leaders in power engineering. These include Siemens, General Electric, Ansaldo Energia, and Mitsubishi Heavy Industries.
Комментарии