GTD-6RM engines for the energy industry have cumulatively logged more than 5 million hours during industrial operation. More than 120 gas turbines are used to drive electric generators as part of small and medium-sized thermal power plants throughout Russia, according to the United Engine Corporation (UEC).
GTD-6RM with a capacity of 6 MW are used as part of GTA-6RM gas turbine power units. They have been produced since 2000.
The conversion turbine was developed on the basis of the D-30KU/KP aircraft engine, which equips Il-76MD, A-50, or Il-78 aircraft, UEC reminded.
Depending on the operating characteristics of the power unit, the engine is manufactured in various versions - for operation on gaseous or liquid fuel.
The engine is capable of operating flawlessly for 120 thousand hours, and its time between overhauls is 30 thousand hours.
Read more materials on the topic:
- Gas turbine engines will be repaired without electricity: a flexible cord instead of plasma
- UEC factories accelerated engine production: machine downtime fell by a third
- PD-8 engine plant is powerfully expanding production