Power supply to the Zaporizhzhia Nuclear Power Plant via two external lines has been restored, according to the station's Communications Director, Evgenia Yashina. According to her, specialists completed the repair work and returned the "Ferrosplavnaya-1" line to service, thanks to which the station's power supply is once again provided through two independent channels.
Earlier, on December 16, the communication line between the switchgears of the nuclear and thermal power plants was damaged, which led to the shutdown of the "Ferrosplavnaya-1" line. For two weeks, the Zaporizhzhia NPP received power only through the "Dneprovskaya" line.
The restoration of two high-voltage lines, as noted at the station, significantly increases the stability of the power system and the reliability of heat supply to both the nuclear power plant itself and the city of Energodar in the winter period.
The Zaporizhzhia NPP is the largest nuclear power plant in Europe, located on the left bank of the Dnieper River near Energodar. The station has six power units with a capacity of one gigawatt each.
Read more on this topic:
Now on home
The personal account, the functionality for submitting the 3-NDFL declaration and the formation of a unified tax account are operating normally
The mill and electrostatic separation increased the efficiency of loparite extraction to 96%
St. Petersburg authorities will invest treasury loan funds in the enterprise
TLS Certificate Restoration and Return to Apple App Store in Question
The heavy equipment from the USA turned out to be capricious in maintenance and weak on black soil
The plant confirmed that demand for these models remains, despite the launch of new Sollers cars
New dampers regulate air supply to the flame tube, increasing engine efficiency
Karanik and Bakanov's negotiations are taking place against the backdrop of Vasilevskaya's successful debut on the ISS
The second T2 line connected the east and south with an interval of six minutes on "Vityaz" and "Lionok" trams
SMS codes for login have not been arriving since autumn 2025
New device for a turbojet engine reduces the acoustic and infrared signature of jet streams