Each warhead of the MRBM has six striking elements
SPC "Ushkuynik": the cable immediately lays on the bottom when the vessel moves and does not break
Engines with thrust vector control gave the fighter high maneuverability
The drone completes the task even after being jammed by electronic warfare systems
Also, the military-industrial complex is repairing, restoring and modernizing old military equipment
Projects are at different stages of readiness
The aircraft's flight range is up to 5.2 thousand km
The aircraft will be equipped with domestic PD-14 engines
The A-100 program "didn't take off," despite the actual availability of a test aircraft
Andrey Boginsky May Head the Company, Despite Scandalous Past
The dual-circuit unit was created using advanced technologies and new materials