The aircraft will have PD-14 engines, according to the corporation's CEO Vadim Badeha
The flight lasted 30 minutes, all systems and equipment worked without failures
The carrying capacity of the device is more than 200 kg
Irkutsk Aviation Plant Starts Assembling the 27th Aircraft
Ministry of Transport will launch a new fee to update airports
Automated cargo delivery throughout the city is planned to be launched by the summer
For the first time in the history of Russian aviation, such a photorealistic image was used on the livery
Such a design would create additional resistance at the inlet of the power unit
Maximum flight time is 30 minutes, cruising speed is 72 km/h
The flight took place on the route Okha city - Nikolaevsk-on-Amur
Drilling machines for assembling the MS-21 aircraft were developed in Irkutsk
The developer of the SSJ-100 aircraft accepted the IAC recommendations aimed at the safe operation of the aircraft
State customers currently prevail in the portfolio of firm contracts for the Tu-214
Maintaining the airworthiness of the aircraft fleet is a priority for the department