Moscow Awaits Recognition of Airbus and Boeing Aircraft Repairs Conducted by Russian Companies
The aircraft is equipped with a TV2-117 engine from the Mi-8 helicopter
The main task of the new equipment is to replace manual riveting with automatic riveting
The power unit manufactured by UEC has increased power in takeoff mode
The flight lasted 30 minutes, all systems and equipment worked without failures
Irkutsk Aviation Plant Begins Assembling the 27th Aircraft
Ministry of Transport to Launch New Fee for Airport Upgrades
Automated cargo delivery throughout the city is planned to be launched by the summer
Such a design would create additional resistance at the inlet of the power unit
The flight took place on the route Okha city — Nikolaevsk-on-Amur
Drilling machines for assembling the MC-21 aircraft were developed in Irkutsk