The plane will take to the skies in April
The plane will take to the skies in April
Rostec announced the readiness of airlines to purchase 200 domestic aircraft
Two new engines are ready for installation on the import-substituted aircraft
UAC stated that the first stage of SJ-100 tests with PD-8 was dedicated to checking the operation of onboard systems
So far, the SJ-100 has made its first flight with the power plants
The state corporation reminded that the start of serial deliveries of the aircraft is scheduled for 2026
The test program includes more than 50 flights
Before being sent to foreign recipients, there should be enough airliners for the domestic transportation market
ODK-Perm Motors also developed a nozzle guide vane and stator
About 40 systems and units will be replaced in the aircraft
Certification Tests of Import-Substituted Passenger Aircraft to Follow
Plans include the construction of a two-story airport terminal complex with a waiting room, cafes, restaurants, and shops
State Corporation Presented a Unit of Russian-Made Laser Gyroscopes
Easing of sanctions could lead to large-scale changes in the Russian aviation industry
A specialization center for assembling doors and hatches for SJ-100 aircraft was previously created in Komsomolsk-on-Amur