A prototype of the non-motorized bogie frame for the high-speed train was manufactured at the Ural Locomotives plant (part of the Sinara — Transport Machines holding (STM). This was reported by the company's press service.
Fatigue and resource tests were carried out at the base of the All-Russian Scientific Research and Design-Technological Institute of Railway Engineering. The frame passed 10 million load cycles for strength on special stands with operational loading, characteristic of high-speed traffic.
The frame is made of a special grade of steel using high-precision robotic welding. It is designed for the operation of rolling stock at speeds up to 400 km/h.
The next stage is testing the frame of the motorized bogie of the high-speed train, the production of which will be completed at Ural Locomotives this summer.
Earlier www1.ru reported that tests have started on the CS-400 contact network for high-speed trains.
Read materials on the topic:
Su-57, Baikal and SJ-100 decorated the Moscow metro train
Now on home
Герой России Гарнаев: никто из профессионалов о возобновлении производства на КАЗ всерьёз не говорит
Система отслеживает спутники на высотах до 50 000 км и ведёт за ними наблюдение
The armored vehicle is equipped with a KamAZ-740.35-400 diesel engine with a power of 400 hp.
Constant improvements in avionics, weapons and tactical capabilities will make the aircraft a flexible response to future challenges
The exterior of the KamAZ-54901 features fairings on the cab and chassis for fuel economy
Fighters are in demand both domestically and abroad
Tyazhpromexport and Venezuela Agree on Plant Revival
The company not only completed the state order, but also quickly mastered the production of AK-12K for special forces
Experts have developed a photogrammetric complex with a resolution of less than 1 cm