A prototype of the non-motorized bogie frame for the high-speed train was manufactured at the Ural Locomotives plant (part of the Sinara — Transport Machines (STM) holding). This was reported by the company's press service.
Fatigue and resource tests were carried out at the All-Russian Research and Development Technological Institute of Railway Engineering. The frame passed 10 million load cycles for strength on special stands with operational loading, typical for high-speed traffic.
The frame is made of a special grade of steel using high-precision robotic welding. It is designed for the operation of rolling stock at speeds up to 400 km/h.
The next stage is testing the frame of the motorized bogie of the high-speed train, the production of which will be completed at Ural Locomotives this summer.
Earlier, www1.ru reported that testing of the KS-400 contact network for high-speed trains has started.
Read related materials:
Su-57, «Baikal» and SJ-100 decorated the Moscow metro train
Now on home
Manturov: The funds will be used to build 50 passenger ships
Military personnel hone their skills to solve tactical tasks
Russians are traveling more often by train and car
На лайнеры установят российские двигатели ПД-8
Work continues on certification of MC-21-310 and Superjet-100
Rosimushchestvo and the Ministry of Finance of the Russian Federation are planning an open auction for the privatization of the facility
Experts advise explaining why services offer similar videos and show personalized advertising
The unique crystal could be auctioned off at a specialized auction
The negotiations concern the order of leasing payments, aircraft operation, and after-sales service
Belarus is interested in joint projects in aircraft construction, defense industry, and transport
Booking will be available through the app
The program until 2035 should involve the Belarusian industrial sector