A prototype of the non-motorized bogie frame for the high-speed train was manufactured at the Ural Locomotives plant (part of the Sinara - Transport Machines (STM) holding). This was reported by the company's press service.
Fatigue and resource tests were carried out at the All-Russian Research and Development Technological Institute of Railway Engineering. The frame passed 10 million load cycles for strength on special stands with operational loading, typical for high-speed traffic.
The frame is made of a special grade of steel using high-precision robotic welding. It is designed for the operation of rolling stock at speeds up to 400 km/h.
The next stage is testing the frame of the motorized bogie of the high-speed train, the production of which will be completed at Ural Locomotives this summer.
Earlier,www1.ru reported thattesting of the KS-400 contact network for high-speed trains has started.
Read related materials:
Su-57, "Baikal" and SJ-100 decorated the Moscow metro train
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation