- Авторы
- Maksim Borisov
The development of the heavy combat vehicle was abandoned in 2008
The submarine of Project 949A, code "Antey", has been undergoing modernization at the Zvezda shipyard of the USC for a long time
Aviation expert Panteleev believes that the weight of the aircraft can be reduced with the start of mass production
Developing a new transport aircraft will take at least a decade
JSC "FCDT "Soyuz" demands 4 million rubles from Aleksin Experimental Mechanical Plant
Russia Has Not Discussed System Supplies to India
Roman Gusarov: A Lot Still Needs to Come Together for the Production of the Il-100 and Il-276 at "Aviastar"
Civil aircraft factories may unite under one wing
Russian engineers have once again demonstrated technical ingenuity
The fighter performed a pirouette at a demonstration in a Southeast Asian country
10 combat vehicles flew in formation
Krylov State Research Centre to take over industry management
41 enterprises became suppliers of components for the aircraft
Leasing submarine project is still unknown
Flight program is being carried out by aircraft with serial numbers 0012 and 0013
The modernization of the complex opened up broad prospects for the military
Combustion chambers of the units were entirely manufactured using additive technologies from a heat-resistant powder alloy
Flap beams have already been installed on the prototype aircraft, and the slat tracks have been adjusted
The Ministry of Defense's claims against NPO "Zavod Volna" reached 173.7 million rubles
The company produces Tu-160 bombers and Tu-214 airliners