In Severodvinsk, the nuclear submarine "Khabarovsk" of Project 09851 was removed from workshop No. 50 of JSC "Northern Machine-Building Enterprise" and launched into the floating dock "Sukhona" for subsequent launching. The ceremony took place on November 1.
The submarine is equipped with a VM-5 or OK-650V water-cooled reactor with a capacity of about 190 MW and SBGD 12-1700 electric generators with a capacity of 1700 kW.
A more modern analogue of the low-frequency passive hydroacoustic system based on the Vinyetka-EM-01 towed array was installed on board the submarine. It is capable of detecting torpedoes at a distance of 30+ km, maneuvering submarines in shallow seas at 10-20 km, and in the deep sea up to 30-35+ km; Arleigh Burke-class destroyers are detected at a distance of 85-135+ km, depending on the hydrological situation.
The Vinyetka-EM-01 system will allow the crew of the "Khabarovsk" to receive hydroacoustic information about the proximity of enemy anti-submarine lines and partially provide Poseidon carriers with data for operations.
Experts also note that the Poseidon carrier, the APL "Khabarovsk",received a pump-jet propulsor to reduce noise.
In addition, the submarine is integrated with a combat information and control system, including the IKS-R-783-0985 communication complex developed by PJSC Inteltech. It is capable of operating in the shortwave range and receiving information from airborne command posts, such as the Il-86VKP (MAXDOME according to NATO codification), as well as from the "Doomsday" station UVB-76.
Read more materials:
- Modernized combat vehicles of the Osa 9A33-2B air defense system sent to a customer in Belarus
- Corvettes "Sovershenny" and "Hero of the Russian Federation Aldar Tsydenzhapov" of the Pacific Fleet discovered and "forced" a submarine of a mock enemy to surface
- Russia is discussing the supply of Oreshnik and Kalibr missiles to Venezuela
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation
Articles
-
Russian An-124 "Ruslan" Stuck in Canada for 4 Years and Accrues Millions in Fines
26 Jan 2026
-
Coaxial Propellers: How Counter-Rotation Increases Turboprop Engine Efficiency
25 Jan 2026
-
Kazan Aviation Plant Breaks Old System: Tu-214 to be Assembled Like Cars
25 Jan 2026
-
How Engineers and Technicians Are Paid Today in the Russian Aviation Industry: An Overview with Figures
24 Jan 2026