The reason for the breach of agreements was the shutdown of Azovstal
The reason for the breach of agreements was the shutdown of Azovstal
The site involves 486 workers and 86 pieces of equipment, including watercraft
Experts will assess the quality of MOX fuel for the BREST-OD-300 fast neutron reactor
The cost of the new car in the basic configuration is 3.54 million rubles
The repair was carried out by order of FSUE "Rosmorport" for servicing RO-RO ferries and transport vessels
The parties agreed on a mechanism whereby gas payments will remain in Turkey
Russia will also build the Soyuz Vostok transit gas pipeline through Mongolia
BELAZ has spent over a year adapting the machine to operate in the challenging conditions of inclined workings in Norilsk mines
The new equipment is designed to analyze the composition of gas emissions at industrial facilities
Energy companies and regulators are discussing a set of measures to ensure the reliability of energy supply in the Integrated Energy System
Dry sprinkling method is designed to replace traditional rolled materials
A total of 15 important components of the future locomotive structures will be tested
The new propulsion device is designed to equip boats and vessels with a displacement of up to 3.5 tons
Model development is already underway
The system implementation eliminates the human factor at a critical stage of chassis assembly