The company minimized the percentage of defects thanks to robots
The 177S engine is capable of developing a thrust of 142 kN and has been modified to increase its stealth capabilities
Certification of the power plant will be completed by the end of 2025
Kazan Aviation Plant Limited by Production Volumes of New Aircraft
Tests are ongoing, but certification has been postponed - reasons are not disclosed
The development is being carried out by specialists from the Ufa Engine-Building Plant
The drone features different control schemes
A radio-technical measurement facility will be built on the territory of the Kazan Aviation Plant
Head of Rosaviatsiya Yadrov: "The most critical 150-hour tests for the engine will begin soon"
The ICAP in Russia will be updated by the end of 2025
The aircraft was built in 1979 and has been in operation for 46 years
The Altai Tire Plant will handle the production of the tires
The aircraft is undergoing final checks at PJSC Yakovlev
Western Aircraft Fleet Retires, While Funding for Domestic Aircraft Production is Cut
Aviation expert Alexei Zakharov: the Mikoyan Design Bureau has other tasks than implementing a half-century-old concept