
Engines from Il-96-300 became turbines with 7 million hours of operation and power plants
Perm GTU-12PG-2 based on PS-90A aircraft engine received a lifetime warranty

Perm GTU-12PG-2 based on PS-90A aircraft engine received a lifetime warranty

Three engines have already been prematurely decommissioned; the defect is linked to substandard overhaul repairs between 2016 and 2024

The parties expect long-term cooperation

Perm designers chose a direct fan drive, like the American GE9X

"ODK-Perm Motors" urged the court to consider the difficult financial situation

Rostec revealed the scope of cooperation in the production of new airliners

ODK to Relocate Head Office to a Russian Region

The contractor will build two 25-megawatt gas turbine units for the plant

ODK-Perm Motors strengthens personnel training in summer

ODK-Perm Motors employee arrested in corruption case

Automation of weekly tasks and transition to standard hours will accelerate the production cycle

State Expert Review Board approves construction of a 10,000 m² facility at "Perm Motors"

The cost of the facility in Novye Lyady is 3.7 billion rubles

The employee's idea has already been approved in the design documentation