
Rosaviatsiya demanded inspection of 53 PS-90 engines on Il-76, Tu-204/214, and Il-96 due to missing pins
Three engines have already been prematurely decommissioned; the defect is linked to substandard overhaul repairs between 2016 and 2024

Three engines have already been prematurely decommissioned; the defect is linked to substandard overhaul repairs between 2016 and 2024

Perm designers chose a direct fan drive, like the American GE9X

KMZ specialists are checking its operation and main parameters on a special test bench before further operation

Each power unit has 18 such power elements

The unit has been operating on associated gas since 2004

The main advantage of the new design is weight reduction

Gas turbines based on PS-90A and D-30 confirmed record reliability at fuel and energy complex facilities

The first domestic laser processing complex for aircraft parts will be operational in two years

The effectiveness of the unit upgrade was proven at a test bench

The financial performance of "ODK-Aviadvigatel" worsened compared with 2024

The powerplant successfully passed the tests

ODK supplied new power units to strengthen Yuzhno-Sakhalinsk CHP-1

From 45 thousand to 250 thousand rubles - real salaries from vacancies in aircraft and engine manufacturing