The new LMS-192 "Osvey" turboprop aircraft, developed jointly by Russia and Belarus, will make its first flight in 2026. However, to deploy full-scale production, it is necessary to seriously expand the workshops, explained Andrey Tuchin, chief engineer of plant No. 558 in Baranovichi.
According to him, the company is already preparing for the production of "Osvey". Now there is a global construction going on here. Three new buildings will be put into operation in stages, each subsequent one larger than the other.
The schedule for creating the aircraft is quite tight. Assembly production is still different from repair production, it needs specific spaces, so the required area is many times larger than what we have today.
From 2027 to 2030, it is planned to supply 158 "Osvey" aircraft. The new aircraft will be equipped exclusively with Russian components, including the VK-800S turboprop engine, which is also being developed by UZGA.
The engine tests are planned to be carried out on the Yak-40LL flying laboratory, in order to obtain a certificate before the end of 2025.
Earlierwww1.ru reported thatthe assembly of the first ventral fin bay of the MS-21-310 aircraft began at the "Sokol" aircraft plant.
Read also:
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation