Modern Russian trams of the 71-911EM "Lion Cub-Moscow" model began to be used on sections of the track where there is no contact network. Since the beginning of autumn 2025, vehicles have been running on route No. 90 in Moscow, providing passenger transportation and overcoming sections without power supply due to batteries.
Trams 71-911EM, developed specifically for Moscow, are characterized by increased energy efficiency and a high level of safety. In particular, the "Anti-Sleep" system monitors the driver's condition, warning him if he loses concentration or shows signs of fatigue, and in a critical situation it is able to automatically stop the tram.
According to the contract concluded in 2025, "ПК Транспортные системы" company must supply the city with 100 trams of this modification by the end of 2026. These are single-section, fully low-floor trams capable of autonomously transporting passengers up to 4 km. The 71-911EM cabin is equipped with 41 seats, with a total capacity of 110 people.
The trams are produced at three factories of the Russian company: Tver Mechanical Plant of Electric Transport in Tver, Nevsky Plant of Electric Transport named after F.A. Pirotsky in St. Petersburg and Engels Plant of Electric Transport in the Saratov Region.
Earlier www1.ru reported that a collectible copy of the Soviet automobile industry VAZ-2103 is being sold for a record price.
Read also materials:
- Largus "chipped": a tuning company from Togliatti installed a turbine in the engine of the station wagon and accelerated it in 8 seconds to "hundreds"
- To increase the production rate of MS-21 aircraft, the Irkutsk Aviation Plant began installing four new machines
- What to watch on the weekend: "First Technical" recommends a film about the courage and heroism of Soviet pilots - "The Crew"
Now on home
The reason for indexation may be inflation, an increase in VAT, and rising production costs
The Ministry of Industry and Trade believes that the increase in the levy will not affect responsible manufacturers
The crew accelerated the aircraft to 580 km/h instead of the cruising speed of 450 km/h
Ship equipment comes to Russia from China at inflated prices
Almaz-Antey and the Belarusian Ministry of Defense signed a contract for equipment maintenance
The complex's computing resources allow for the competent distribution of targets between launchers
Among the spacecraft are Aist-2T No. 1 and No. 2
Deputy Prime Minister Novak announced a postponement of the deadlines, but confirmed the commitment to developing the sector
Design engineers without experience are promised salaries from 80 thousand rubles
Hard and dense shot ensures the destruction of the target from the first hit, regardless of the drone's body material
Almost all body elements are zinc-treated
SOGAZ lost the case in court against UEC-UMPO