United Engine Corporation (UEC) is ahead of schedule in implementing Russian software for the design and production of aircraft engines, according to the corporation's press service. The program is being implemented within the framework of the "Engine Building" industrial competence center and is aimed at the technological independence of the industry.
The accelerated implementation of software allows for the successful development and manufacture of parts from composite materials for the PD-14 aircraft engine.
Thanks to the use of domestic CAD/PLM systems, such as "Kompas 3D" and "Lotsman", as well as the "KOMPAS-Composites" module, the Perm enterprise was able to create a prototype part for the engine
The implementation of Russian software covers several areas: design, product lifecycle management (PLM), reference materials (POLINOM:MDM), cable design (CAD MAX), and supply chain management (system from SPC 1C).
At the UEC-STAR enterprise, the supply chain management system is already being tested in two workshops and five departments: about 100 employees daily create orders, keep records of materials, and compile shift tasks.
It is emphasized that the project for the implementation of SCPM is 84% complete, and for the import substitution of CAD/PLM products - 68%. The next stage is the pilot industrial operation of the system in all UEC-STAR workshops and preparation for implementation at UEC-Salut and UEC-Saturn enterprises.
Read more materials:
UEC Guarantees After-Sales Service for VK-650V Engines
"The Only Unit in its Class": UEC Produced the Second Serial High-Power Turbine GTD-110M
Now on home
Soviet "corncobs" are offered for 1.2 to 1.5 million rubles at the start of trading
The National Library of Russia will have to settle for domestic products
Thanks to American modules, communication with the operator remains uninterrupted
The equipment eliminates errors made by humans
The company switched to the Yadro technology stack to improve server management
The complex remained on the KamAZ-6560 chassis and is capable of using two types of anti-aircraft missiles
Over the past 5 years, 140 thousand km of roads have been built and repaired in Russia
The surcharge for the 4x4 hybrid version is 305 thousand rubles
Plans to Improve Verification Procedure on "Gosuslugi" Portal
The Lipetsk Mechanical Plant updated the ventilation system of the hull production
The development reduces the activation energy of thermal decomposition by 25%
"Lenmorniiproekt" has started searching for contractors to carry out the work