The Aeroflot Group expects to receive more than 100 new domestic MC-21 aircraft by 2030. However, such plans can be considered unrealistic, said Major General (Retired), Honored Military Pilot of the Russian Federation Vladimir Popov.
According to him, a lot of time has been lost since 2023, when the aircraft industry development program was being drawn up. The expert clarified that the aircraft with domestic PD-14 engines has not yet been certified.
It will be very difficult and time-consuming. Today it is unrealistic. Certification tests are not yet completed.
Popov added that many systems and parts of the MC-21 are being created virtually from scratch, so any forecasts should be treated with caution.
I'm not exaggerating, no, it's a fact, just real work. We had to create composites for the wing, all systems and components on our own technological base, and today we are lagging behind in mass production.
As part of mass production, 14 MC-21-310 aircraft were assembled at the enterprises of the United Aircraft Corporation (UAC, part of Rostec) assembled 14 MC-21-310 aircraft.
Earlier www1.ru reported that the import-substituted MC-21 aircraft successfully tested radio-electronic equipment.
Read more materials:
PJSC Yakovlev named those responsible for the "magic of flight" of the SJ-100 aircraft
ODK will focus on increasing the flight life of PD-8 and PD-14 engines for SJ-100 and MC-21
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation