Flight certification tests of the import-substituted SJ-100 aircraft are ongoing in the Moscow region, which started in early June. Now it's time for radio communication tests.
The flight to test the new domestic equipment lasted 2.5 hours.
The flight went perfectly today; we were performing radio communication tests. There is constant dialogue with people and instructors regarding this aircraft. I see no problems with either the modifications or the execution of the tests.
In total, by the end of 2025, the test pilots will have to perform about 200 flights on three prototypes of the SJ-100. Two other SJ-100 aircraft will join the tests after PD-8 engines are installed on them in Komsomolsk-on-Amur. Currently, as part of the SJ-100 factory and certification testing program, approximately 30 flights have already been successfully completed.
Read more on this topic:
Modernization: Glazing for Russian MS-21 and SJ-100 aircraft will be produced even faster
Now on home
Герой России Гарнаев: никто из профессионалов о возобновлении производства на КАЗ всерьёз не говорит
Система отслеживает спутники на высотах до 50 000 км и ведёт за ними наблюдение
The armored vehicle is equipped with a KamAZ-740.35-400 diesel engine with a power of 400 hp.
Constant improvements in avionics, weapons and tactical capabilities will make the aircraft a flexible response to future challenges
The exterior of the KamAZ-54901 features fairings on the cab and chassis for fuel economy
Fighters are in demand both domestically and abroad
Tyazhpromexport and Venezuela Agree on Plant Revival
The company not only completed the state order, but also quickly mastered the production of AK-12K for special forces
Experts have developed a photogrammetric complex with a resolution of less than 1 cm