
UZGA to start supplying LMS-192 "Osvey" abroad: 158 units won't be built in 4 years
Certification expected by the end of 2029

Certification expected by the end of 2029

The second cockpit turns the fighter into an airborne command post

The parties are coordinating additional expenses, and they want to set up the assembly of the aircraft at NAZ "Sokol"

ODK: localization of the EU-650 power unit is at 80%

The Ministry of Industry and Trade has set the final deadlines for the certification of the aircraft's main components

Onboard digital equipment scans more than 100 points per square meter

Initial calculations promise up to 6% additional lift and a reduction in aerodynamic drag by approximately 10%

Russia and Belarus are coordinating additional expenses for the new project

The aircraft was developed by NPO "Avia LTD" in the late XX century

The American power plant allows loading up to 1.5 tons of cargo

The site previously intended for Il-114 parts assembly is to be used for LMS-192 production

Sergey Alexandrovsky: "It is important for us that the aircraft has high economic efficiency indicators"

The agency is not against considering projects by Russian developers when forming projected procurements

Anton Alikhanov: the LMS-901 prototype is being prepared for static tests at TsAGI