OAK specialists found no manufacturing defects in the aircraft
The crew deliberately simulated system failures to confirm the reliability of the aircraft
The company has minimized the percentage of defects thanks to robots
The 177S engine is capable of developing 142 kN of thrust and has been modified to increase its stealth capabilities
Certification of the power plant will be completed by the end of 2025
Kazan Aviation Plant Limited by Production Volumes of New Aircraft
The development is being carried out by specialists from the Ufa Engine-Building Plant
The drone features different control schemes
A radio-technical measurement facility will be built on the territory of the Kazan Aviation Plant
Head of Rosaviatsiya Yadrov: "The most crucial 150-hour tests for the engine will begin soon"