The aircraft will be equipped with domestic PD-14 engines
Andrey Boginsky May Head the Company, Despite Scandalous Past
Test pilot Savonin: Engines performed stably in all tested acceleration and throttling modes
The airframe needs to be protected from atmospheric precipitation and ultraviolet radiation
Changes were required to install Russian systems and units
The company has modernized the SJ-100 production line
The company has set the completion of aircraft testing as one of its key tasks
The final cost of the aircraft is also not fully clear
Net Loss of "Yakovlev" Company Increased to 4 Billion Rubles in the First Half of 2025
Prolonged holding of the side control stick in a dive will allow reaching a speed of 618.5 km/h
New suppliers of aircraft parts will be involved
The liner was tested by Yakovlev pilots and the Aviation Register of the Russian Federation
The workshops of the Irkutsk Aviation Plant have been replenished with nine advanced numerically controlled machines
The reason is the integration of new domestic systems
The tests took place in the final assembly shop of the Irkutsk Aviation Plant