Revolution in the MC-21 Aircraft Assembly Shop: Work Accelerated Several Times Over

Engineers have developed a special trolley for quick stabilizer installation

A new method for installing stabilizers has been developed in the final assembly shop of the MC-21 at the Irkutsk Aviation Plant. This was reported by the press service of PJSC "Yakovlev" (part of UAC).

A massive and bulky traverse is usually used to install the stabilizer on the aircraft. There is no space for storing such large equipment near the assembly station, so it was placed in another part of the shop. Each time, four riggers transported it to the station using an overhead crane.

Sergey Popov, the shop equipment foreman, came up with a special trolley for the traverse, which allows it to be stored directly under the assembly station. Employees of the mechanical group welded the structure from a profile pipe and attached swivel wheels to it.

After the implementation of this proposal, when it is required to install a stabilizer on an aircraft, two people roll the traverse out from under the station - it takes no more than a minute.

Earlier www1.ru reported that ODK revealed the technology of "growing" blades for PD-8 and PD-14 aircraft engines.

Read more materials:

Import-substituted spare parts for SJ-100 will become cheaper: they used to cost twice as much as Airbus parts

Rostec will acquire an aviation enterprise in Sevastopol in mid-2027

Aeroflot's plans for a hundred MC-21s by 2030 are fairy tales: the planes do not yet exist physically

Now on home