The availability of OSAGO will not be checked
New approach reduces the interval of following trains by 4-6 minutes
Total capacity of all four reactors — 4.8 thousand MW
Research Was Conducted in the Arctic
The development is also suitable for use in microelectronics
The development will allow testing the toxicity of gene-therapeutic drugs
The project will help train qualified specialists
The system charges several batteries simultaneously
Amendments will be made to the Air Code of the Russian Federation
The project will also increase labor productivity by 5%
The device allows measurements to be taken without operator intervention
The company plans to produce 1.5 thousand units of devices in 2025
Winter tires will begin production in the first half of 2025