Semargl Plant is 85% Ready
Semargl Plant is 85% Ready
The company has become the only full-cycle car audio plant in the country that meets the requirements of the car assembly line
Hull sections will be manufactured at the Perm Shipyard
The complex integrates all measuring equipment and collects data from production to shipment
The Ministry of Education and Science will coordinate the creation of unified requirements for supercomputer centers and access to them for science and industry
The complex will produce products for 5G, aviation, and electric transport
The enterprise will master the casting of steering wheel frames from magnesium alloy and the sewing of materials
Siberian scientists used VEPP-3 and VEPP-4 synchrotron radiation to develop a gradient coating of iron, tungsten, and molybdenum
Mooring equipment has been installed on the vessels, watertightness tests have been conducted
By 2028, the company plans to assemble up to 40,000 devices annually
A joint group of developers, commissioned by the state, is making a replacement for Keysight and AWR
Units with a capacity of 15.6 kW will go to specialized systems performing strategic tasks
The enterprise will be able to assemble large-sized structures
The shipyard is preparing to build heavy ice-class vessels with a displacement of up to 10,000 tons
State Expert Review Board approves construction of a 10,000 m² facility at "Perm Motors"