
Two Turbines at 74.8 Meters Head: Chechnya Builds Republic's Most Powerful HPP
Two vertical radial-axial hydro-units will provide the station with 23 MW capacity

Two vertical radial-axial hydro-units will provide the station with 23 MW capacity

"RusHydro" will install a new PL 20-V-1030 unit

Core catcher will be modernized to meet new requirements

The equipment will be inspected and placed in the VVER-1200 reactor shaft