
UAC accelerated the production of doors for MC-21 and "Superjet" due to a new line
The "Yakovlev" plant installed painting chambers in Komsomolsk-on-Amur

The "Yakovlev" plant installed painting chambers in Komsomolsk-on-Amur

In the future, a patrol boat and a pilot boat will be built from the same material

The design capacity of the station will reach 410 MW of electrical and 1389 Gcal/h of thermal energy

The new product works on pure mechanics without a single microcircuit

The plots were illegally removed from state ownership: they wanted to build high-rise buildings on them

LLC "Uralenergosbyt" is recovering debt from a strategic enterprise

Air separation unit produces up to 40,000 m³ of oxygen per hour

The employee's idea has already been approved in the design documentation

The K1892VM21Ya chip helps recognize objects in real time

The 88-ton structure will protect the reactor from loads

Full cycle of work organized in the Belgorod region