
Completion Date Announced for "Baikal" Aircraft Production Site in Khabarovsk Territory
The total area of buildings and structures will be almost 10.4 thousand m²

The total area of buildings and structures will be almost 10.4 thousand m²

Flight tests will begin after the completion of ground tests

The remains of the aircraft will be removed by the end of February

What happens to old airliners that have reached the end of their service life

Mock-ups of power plants for airplanes and helicopters will be demonstrated at the Aero India exhibition

The countries plan to establish the production of armored vehicles, small arms and ammunition

The Russian multirole fighter of the "4++" generation is designed to operate in armed conflict zones

The parts differ from traditional ones: they have branched and mesh structures

Production time for power plant blades reduced from 6 months to 10 days

The device is used to detect and analyze defects in metal products

Director of the Institute of Thermophysics of the SB RAS Dmitry Markovich: the PD-35 engine line has energy applications

The dual-circuit turbofan engine was developed using advanced technologies

Easing of sanctions could lead to large-scale changes in the Russian aviation industry

Combustion chambers to be optimized

The basic turbofan engine was created using advanced technologies and materials