ОДК показала кадры официальных испытаний турбовинтового двигателя ТВ7-117СТ-01 для лайнера Ил-114-300

During the tests, hundreds of sensors are connected to the power unit

The United Engine Corporation (ODK) has shown footage of official tests of the TV7-117ST-01 turboprop engine for the Il-114-300 aircraft.

Testing of the TV7-117ST-01 engine
Testing of the TV7-117ST-01 engine

ODK specialists manufacture parts from modern materials using advanced technologies. Each part undergoes thorough inspection, and the assembled engine undergoes a series of multi-hour tests.

Загрузка Telegram видео...
The longest stage is checking the reliability of the power plant on a test bench. Hundreds of sensors are connected to the engine, which monitor the operation of each of its systems.
ODK

The TV7-117ST-01 is equipped with a modernized engine and propeller control system (SAU-65ST-01), which includes a BARK-65SM-01 control unit and an electronic control unit.

The engine has improved operational manufacturability and maintainability, as well as increased take-off power. The power plant can be safely operated at an outside air temperature from -60 °C to +60 °C.

Il-114-300
Il-114-300

Earlier, www1.ru reported that certification of the Il-114 aircraft is scheduled to be completed by the end of 2025.

Read more materials:

Dozens of breakthrough solutions: Rostec spoke about the development of the PD-14 engine for the MS-21 airliner

Support with rubles: almost 2 billion rubles will be allocated for the development of a shortened MS-21 project

Competitors for Airbus and Boeing: seven Russian aircraft are undergoing certification

Sources
ODK

Now on home