Each product includes more than 5,000 components
The satellite was launched on December 25, 2024
The M-class flare lasted 16 minutes
The manned mission is scheduled to launch on April 8
Russian Companies Recommended to Switch to Domestic Hosting Providers
The 118 hp engine remained unchanged
Moscow awaits recognition of Airbus and Boeing aircraft repairs conducted by Russian companies
The aircraft is equipped with a TV2-117 engine from the Mi-8 helicopter
Improved units are planned to be installed on the UAZ SGR family of vehicles and other models
In case of violation of the new requirement, the fine can reach 500 thousand rubles
The new device consumes less energy compared to its counterparts
In the absence of the desired model from the seller, it was recommended to conclude a preliminary supply agreement
The need for annual anti-corrosion treatment is necessary for prevention
Tests were conducted at the sixth power unit of the station
Magnetic storms may occur in early April
Car production will be set up in the Silk Way version
The next stage is the final assembly of the cabin at the Traks Vostok Rus plant
The plan is to produce at least 100 vehicles annually
Discounts apply to electric vehicles of categories N2 and M2
The plan was to increase the engine compression to an incredible 22:1