Nuclear scientists installed in-vessel devices and other equipment
Nuclear scientists installed in-vessel devices and other equipment
Its scheduled maintenance is complete
The complex monitors engines, turbines, boilers, pumps, and other equipment, reducing failure rates and increasing reliability by 35-50%
The solution is currently slower than products from foreign vendors, but the cards in these servers are cheaper and more energy-efficient
The development can be used in arctic conditions
The mobile unit allows examining large objects and products of complex geometric shapes on-site
KMZ development is being installed on Afalina boats
The work was carried out by specialists from Atomenergo remont
Rosatom: Work is underway on power unit No. 1
The main feature of the model is the absence of a toe and shock absorber on the crankshaft
It has 100% localization in Russia
The development replaced foreign counterparts
Rostec Invested 2.5 Billion Rubles in Modernizing Mining Equipment
The machines are equipped with new cabs - Comfort Cab III (S520) and Luxury Cab II (S530/S620)
The company has created more than 800 jobs