Power plants of this class will replace foreign counterparts
Power plants of this class will replace foreign counterparts
Work is underway on power unit No. 1
The machines will be used to manufacture large aircraft parts
A unique protection system will increase the safety level of the station
The equipment is also suitable for installing the Main Circulation Pump of the unit
At the plant producing cabin frames, 117 robots work alongside 223 personnel
The new RECOM system was first used during the launch of the heavy-lift Angara-A5 rocket
The share of Russian components is steadily growing
Students will be trained in printed circuit board assembly technology
The production site will appear in 2025
Rosatom State Corporation strengthens cooperation with the Republic of the Congo in nuclear and hydropower
The icebreaker was laid down in January 2024
State Corporation to expand staff to 440,000 people
The blocks are being installed by a heavy-lift crane with a lifting capacity of 1350 tons
This is the first domestic industrial gas turbine engine of such power and with a design efficiency of up to 40%