
Import Substitution for 1.45 Billion Rubles: Domestic Production of EP2DM and EP3D Electric Trains Established in Moscow Region
Production of Gearboxes for Ivolga 4.0 Electric Trains Also Mastered

Production of Gearboxes for Ivolga 4.0 Electric Trains Also Mastered

The enterprise will be located near KAI

The terms and participants of the project are already known

Fuel nozzle housings are now made in 24 days instead of six months

"Tupolev" plans to conclude a settlement agreement with "Tatneft" on a lawsuit

NKN Company has released software for designing a digital model of a composite package structure

Total project capacity is 300 MW, annual output is 879 million kWh

All buildings of the complex will be ready for operation in December 2026

Meeting on the case of JSC "Reshetnev" will be held on December 25

Additive technologies have become firmly established in the engine building of the future

In 2025, the production of the isotope reached 111% of the plan, providing for the needs of medicine and industry

Experts accelerated train braking system elements to 400 km/h

Roman Gusarov: work will begin when there is an assignment to make an engine for a specific aircraft

The equipment was developed specifically to order

The corporation continues bench tests in Perm