
Future Creators of PD-8 Sent to Machines Before Graduation
Students work with the digital model of the engine starting from their third year

Students work with the digital model of the engine starting from their third year

Developed by ODK-UMPO in collaboration with UUNIT scientists

The patented device is designed for use in three-phase networks

Case involving the Ministry of Defence heard in closed session

The equipment operated for almost a year on someone else's plot and was powered by the common electricity grid

UTZ's new design will save repairmen from galling and re-manufacturing parts

Engineers, architects and designers will be able to work in a common information environment

The company added powerful infrastructure at the largest fields in the Yamal-Nenets Autonomous Okrug and Tyumen Region

A harness itself can consist of two conductors or up to two hundred

The 370-ton monoblock will operate for 60 years at a gold deposit in Chukotka

The number of operating gas stations has increased, and fuel queues have started to shrink

The new component is designed for industrial frequency converters with a 400 Hz load

Komsomolsk plant is loaded with orders until 2030 and needs personnel

about 42% of the electronics used may still be imported or not have the status of Russian products