
Will survive an earthquake: Rosatom began concreting the foundation of the turbine for the BREST-OD-300 reactor in Siberia
The foundation of the BREST-OD-300 turbogenerator is designed for equipment weighing over 1.7 thousand tons

The foundation of the BREST-OD-300 turbogenerator is designed for equipment weighing over 1.7 thousand tons

Twenty domestic DTA-380U1 traction electric units are installed on one 11-car train

Kirov Oblast authorities brought Omutninsk Metallurgical Plant into contact with KAZ

The powerful structure with a lifting capacity of 23.5 thousand tons will accelerate the launching and repair of large vessels

Russian Prime Minister called PD-14 and PD-8 examples of technological sovereignty

The Kurchatov Institute's propulsion system is designed for multiple activations

The super-heavy unit from the Russian state corporation will strengthen positions in aviation and energy

Salym field reserves increased 12-fold - geologists revised assessment of Achimov formations

The initiative will affect energy-intensive projects, including data centers and mining sites

The installations are based on AL-31 and PS-90 aircraft engines

MAI engineers are creating a motor for drones and light aircraft

The equipment was installed at the checkpoint of one of the nuclear industry enterprises

Smart tracked machine can operate without human intervention

The novelty can be used in electric vehicles

Decision Made After Successful Employment of a Combat Veteran