
Certification difficulties will not hinder: four MC-21 aircraft to be produced in 2026
The aircraft will be equipped with domestic PD-14 engines

The aircraft will be equipped with domestic PD-14 engines

Andrey Boginsky May Head the Company, Despite Scandalous Past

Test pilot Savonin: Engines performed stably in all tested acceleration and throttling modes

The airframe needs to be protected from atmospheric precipitation and ultraviolet radiation

Changes were required to install Russian systems and units

The company has modernized the SJ-100 production line

The company has made the completion of aircraft testing one of its key tasks

The final cost of the aircraft is also not fully understood

Net loss of "Yakovlev" company in the first half of 2025 increased to 4 billion rubles

New suppliers of aircraft parts will be involved

The liner was tested by Yakovlev pilots and the Aviation Register of the Russian Federation

The workshops of the Irkutsk Aviation Plant have been replenished with nine advanced numerically controlled machines

The reason is the integration of new domestic systems

The tests took place in the final assembly shop of the Irkutsk Aviation Plant
The corporation called the improvement of aircraft design an unconditional priority