
New Russian Installation for Electron-Beam Welding of Large Gas Turbine Engines Starts Operating
It is designed for the production of components and parts for the GTD-110M, which helped Russia replace generating equipment through import substitution

It is designed for the production of components and parts for the GTD-110M, which helped Russia replace generating equipment through import substitution

Thanks to it, Russia will produce up to four of these power plants annually from 2028

Robotic equipment will be able to handle the repairs

They are replaced by mathematical modeling using a new domestic program

The country is demonstrating a similar GTE-110M unit in China for the first time

High-power turbines GTD-110M from Rostec's subsidiary UEC help in this endeavor

Engine manufacturers will reduce full-scale tests of the PD-8, but this will not affect engine safety

The "Udarnaya" TPP is the first to receive a new domestic high-power gas turbine GTD-110M

"Advance Engineering" has developed a computing complex for UEC

Their serial delivery begins in 2024

Replenishing the grouping of Russian military satellites has both defense and quite peaceful goals

They Have to be Purchased in Several Times More Quantity

According to the president, "90 percent is already a fully localized product"

The tests were conducted at TsAGI's facilities

UEC to Increase Production of Power Plants for Aircraft and Helicopters Several Times Over