Technopromexport Company of the Rostec State Corporation has tested the second power unit of the Udarnaya TPP in the Krasnodar Territory, which runs on natural gas. The equipment operated for 72 hours in nominal power mode of 230 MW and contributed to the Unified Energy System of Russia, confirming all the declared characteristics.
The total capacity of the Udarnaya TPP is 560 MW, the first power unit with 230 MW is already ready and has been operating since the beginning of March. "Udarnaya" is unique not only because it was built by Russia independently in the context of sanctions and restrictions on the supply of imported equipment.
The equipment of "Udarnaya" includes a domestic high-power gas turbine GTD-110M, capable of operating in the power range from 118 MW to 495 MW and higher. This is the first Russian installation of this class.
GTD-110M
This is a single-shaft gas turbine for driving electric generators as part of gas turbine power and combined cycle plants of high power. It can run on various types of fuel: natural gas, associated petroleum gas, kerosene, diesel fuel.
The characteristics of GTD-110M include:
- power on the power turbine shaft (ISO 2314) - 118 MW;
- efficiency (ISO 2314) - 36.0 %;
- output shaft rotation speed - 3,000 rpm;
- fuel consumption (at nominal mode) - 23,700 / 28,200 kg/hour;
- gas outlet temperature - 517 °С;
- gas outlet flow rate - 361 kg/s.
The weight of the turbine on the frame is 60 tons, its dimensions are 7.19 x 3.76 x 4.34 m.
Read materials on the topic:
Instead of Siemens: Russia Started Producing New Gas Turbines with a Capacity of 170 MW
UEC Will Radically Increase the Production of Gas Turbine Units
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation
Articles
-
Russian An-124 "Ruslan" Stuck in Canada for 4 Years and Accrues Millions in Fines
26 Jan 2026
-
Coaxial Propellers: How Counter-Rotation Increases Turboprop Engine Efficiency
25 Jan 2026
-
Kazan Aviation Plant Breaks Old System: Tu-214 to be Assembled Like Cars
25 Jan 2026
-
How Engineers and Technicians Are Paid Today in the Russian Aviation Industry: An Overview with Figures
24 Jan 2026