News Articles
  1. Companies
  2. Kazanskiy aviazavod
Russian Aircraft Industry to Be Left Without Funding Until Sberbank Audit
26 авг. 2025 г., 12:30:48
Russian Aircraft Industry to Be Left Without Funding Until Sberbank Audit

\"Business Online\": a report on the state of affairs in the industry will be sent directly to Prime Minister Mikhail Mishustin

Новости Aviation Kazanskiy aviazavod PAO «OAK» GK «Rosteh» Minpromtorg RF 1
Maksim Borisov
Kazan Aviation Plant to Supply 11 Tu-214s Under Contracts: 5.6 Billion Rubles per Aircraft
22 авг. 2025 г., 13:07:45
Kazan Aviation Plant to Supply 11 Tu-214s Under Contracts: 5.6 Billion Rubles per Aircraft

Rostec Head Chemezov Reminded That No Country in the World Has a Complete Aircraft Production Cycle

Новости Aviation Kazanskiy aviazavod
Maksim Borisov
"The aviation industry has devoured a lot of money and produced nothing": former director of the Tupolev branch raises the alarm about the situation in the industry
22 авг. 2025 г., 11:36:42
"The aviation industry has devoured a lot of money and produced nothing": former director of the Tupolev branch raises the alarm about the situation in the industry

There are big problems with design schools and the connection between generations of specialists

Новости Aviation PAO «Tupolev» Kazanskiy aviazavod PAO «OAK»
Maksim Borisov
Tu-160M and Tu-214 manufacturer introduces new equipment for measuring complex geometric shapes
21 авг. 2025 г., 01:30:55
Tu-160M and Tu-214 manufacturer introduces new equipment for measuring complex geometric shapes

The machine in the KAZ workshop consists of modules and a probe with a ruby ball at the end

Новости Aviation Kazanskiy aviazavod
Maksim Borisov
Forgotten Tu-204SM is in no way inferior to Airbus and Boeing: designer called for giving the aircraft a chance
20 авг. 2025 г., 00:05:20
Forgotten Tu-204SM is in no way inferior to Airbus and Boeing: designer called for giving the aircraft a chance

Designer Alasheev: first the Tu-204SM needs to be brought up to modern standards

Новости Aviation Kazanskiy aviazavod
Maksim Borisov
Tu-204 Chief Designer Sentenced Tu-214: "It Won't Take Off" Due to PS-90A and Weight
19 авг. 2025 г., 13:16:31
Tu-204 Chief Designer Sentenced Tu-214: "It Won't Take Off" Due to PS-90A and Weight

Engine life before overhaul - only 7,000 flight hours

Новости Aviation Kazanskiy aviazavod 2
Maksim Borisov
Six Special Tu-214PU Aircraft with a Range of 10,500 km Built in Russia
16 авг. 2025 г., 15:10:55
Six Special Tu-214PU Aircraft with a Range of 10,500 km Built in Russia

The aircraft are equipped with PS-90A engines and modern communication equipment

Новости Aviation Kazanskiy aviazavod
Maksim Borisov
The "Short" Version of the Tu-214 Aircraft: Why is the Project Needed if There is the MC-21?
4 авг. 2025 г., 16:02:33
The "Short" Version of the Tu-214 Aircraft: Why is the Project Needed if There is the MC-21?

Shortened versions perform well in "rolling out" new directions

Новости Aviation Kazanskiy aviazavod
Maksim Borisov
Flight Engineers to be Trained for Tu-214: Relic of the Past or Revival of the Profession?
31 июл. 2025 г., 08:51:45
Flight Engineers to be Trained for Tu-214: Relic of the Past or Revival of the Profession?

The specialty has regained relevance with the resumption of the liner's production at the Kazan Aviation Plant

Статьи Aviation Kazanskiy aviazavod 1
Maksim Borisov
Modernized Tu-214 Aircraft Flew for Testing Over Kazan
30 июл. 2025 г., 12:13:42
Modernized Tu-214 Aircraft Flew for Testing Over Kazan

115 Aircraft to be Built at KAZ by 2030

Новости Aviation Kazanskiy aviazavod
Maksim Borisov
Tu-160 "White Swan" bomber manufacturer to spend 1.5 billion rubles on a new workshop
24 июл. 2025 г., 11:34:22
Tu-160 "White Swan" bomber manufacturer to spend 1.5 billion rubles on a new workshop

A radio-technical measurement facility will be built at the Kazan Aviation Plant

Новости Aviation PAO «Tupolev» Kazanskiy aviazavod 1
Maksim Borisov
Long-suffering Tu-214: the main reasons for delays in the construction of the aircraft are named
23 июл. 2025 г., 09:23:36
Long-suffering Tu-214: the main reasons for delays in the construction of the aircraft are named

These include the delay in the technical re-equipment at KAZ and an acute shortage of labor

Новости Aviation Kazanskiy aviazavod
Maksim Borisov
Will the Tu-214 Revival Not Happen? Aviation Expert Skeptical About Plans to Build 20 Aircraft Per Year
22 июл. 2025 г., 12:13:49
Will the Tu-214 Revival Not Happen? Aviation Expert Skeptical About Plans to Build 20 Aircraft Per Year

400 Million Rubles Allocated for Tu-214 Modernization

Новости Aviation PAO «Tupolev» Kazanskiy aviazavod
Maksim Borisov
To Delay Is Not An Option: Kazan Aviation Plant Must Determine the Timeline for Tu-214 Production
20 июл. 2025 г., 10:55:09
To Delay Is Not An Option: Kazan Aviation Plant Must Determine the Timeline for Tu-214 Production

Mishustin Instructs to Define Schedules for the Production of Domestic Aircraft

Новости Aviation Kazanskiy aviazavod
Maksim Borisov
First Tu-214s Will Be "Cast in Gold": No Less Than 5.6 Billion Rubles Per Aircraft
19 июл. 2025 г., 09:21:22
First Tu-214s Will Be "Cast in Gold": No Less Than 5.6 Billion Rubles Per Aircraft

High prices for the airliner will persist with small-scale production

Новости Aviation Kazanskiy aviazavod 1
Maksim Borisov

Showing 76 to 90 of 108 results

1 2 3 4 5 6 7 8
www1.ru

Первый технический

About
Sections
News Articles
Information
About Terms of Use Использование cookies Privacy policy Advertise
Thematics
Aviation Cars Cellular network Finance General Industry Information Security Medical equipment Military technology Neural networks Science Social networks and Messengers Software and Apps Transport
Все права защищены © 2024—2026
www1.ru — «Первый технический»