
Akkuyu NPP Receives Nuclear Fuel Batch for Second Power Unit
Fuel assemblies were placed in a special storage facility before being loaded into the reactor

Fuel assemblies were placed in a special storage facility before being loaded into the reactor

NPPs in China are being built with the flagship reactor of GC "Rosatom" VVER-1200

The second anti-Russian sanctions package in January 2025 hits enterprises related to space, industry, and the Ministry of Defense

The development used domestically produced equipment

The WPP will consist of 120 Russian-made wind turbines

Vessels planned for transplant by 2030

The station site in Hungary is already ready for pouring the first concrete

The project will be implemented in the next 15-20 years

Its lightness, strength, hardness, and heat resistance make it indispensable in the defense industry, aircraft construction, rocket engineering, electronics

Russia ranks first in the world in terms of experience in operating "fast" reactors

The German company neither delivered equipment crucial for the future NPP nor returned the money paid for it by the Russian side.

The radiation background in the area of the NPP after the shutdown is normal

The project implementation will help reduce carbon dioxide emissions into the atmosphere by 35 million tons

The new method for prospecting natural resources is based on the method of registering the flow of cosmic muons