Possible creation of an additional unit at Belarusian NPP or a new station in Mogilev region
The Russian Federation is working on a megawatt-class nuclear space tug
24 metal structures with a total weight of 156 tons will be produced for the lower tier
Expected production volume — up to 300 kg of beryllium per year
Blanks weighing approximately 600 tons were manufactured to create the reactor vessel
All work is proceeding according to plan
Upgraded equipment improved the plant's performance
The stations will provide charging up to 80% in 30–40 minutes
Scientists at the Institute for Physics and Power Engineering have created the "Mineral 100/150" unit for processing radioactive sodium
The tests were conducted at the sixth power unit of the station
In the future, the complex will allow obtaining drinking water quality
The development of Russian nuclear technologies does not depend on the decisions of foreign states, Likhachev said
Welders used about 2 tons of flux and more than 1.5 tons of special wire
Communication established between the turbine protection system and the power unit operator's console
Turbine shaft rotated at low speed during testing